Dr. Vladimir Vasilyev (CNIIMF) 講演

NSR OPERATIONS
New rules and possibilities
Speaker: Vladimir Vasilyev
CNIIMF Ltd. (NSRA data included)
NEW NSR BORDERS – AREAL DEFENITION
2
RE-ESTABLISHED NSR ADMINISTRATION
BASIC FUNCTIONS
Applications: apply – consider - issue
Monitoring: hydrometeorology, ice, navigation
ATONs, hydrographic survey – approval
Information support service: organisation, safety requirements, hydrographic
support, icebreaking assistance
Recommendations: routing, icebreaking support
SAR operations: organisation and assistance
Ice pilotage: certification of pilots
Assistance: spill/garbage combat
3
HOW : Algorithm for permission
Apply early 120 days¥latest 15
working days before entry date
Official website:
Publication of
application
10 days consideration
Accepted
Declined
Information on
acceptance¥refusal – official site
4
Application statistics.
2013 ships
- applications
- 718;
- permission granted
- 635,
Foreign flag
- 127 (20 %);
- Declined initially - 83 ,
Finally declined
- 18 (3,5 %)
Permission granted
Declined
5
Typical ice prediction for 3 days of September 2014 (AARI)
Восточно-Сибирское
море
6
Actual ice conditions – September, 2 2014
7
May 2014. Kandalsksha – Isl. Kotelny supply voyage.
Cargo Ivan Papanin M/V, support Vaigach Icebreaker
Barentz sea
Kara sea
Laptev sea
Temp
East-Siberian
sea
Dikson
Sabetta
Tiksi
Pevek
Kandalaksha
8
31 May 2014. Fast ice offloading.
9
Ice cutter for channel borders.
10
Kara Sea activities
«West Alpha»
Universitetskaya -1
Dikson
Sabetta
Tanalau
Dudinka
Novy port
11
Double action vessel in Dudinka port, winter navigation.
12
Sabetta port construction, CNIIMF
Routes and dredging.
13
Sabetta port construction, CNIIMF
VTS, AIS & GMDSS.
14
JGC, in consortium with Technip,
awarded the Yamal LNG project in Russia
本プロジェクトは、ロシアの独立系ガス会社である
ノバテクが中心となり、ロシア国ヤマル・ネネツ自
治区サベタで年産1,650万トンのLNGプラントを新
設する計画です。
本プロジェクトにおいて当社は、テクニップとジョイ
ントベンチャーを組み(テクニップがリーダー)、まず
最初のフェーズとして、年産1,650万トン (550万ト
ン×3系列)のLNGプラントに係る有償見積り、詳
細設計および一部長納期機器の調達役務を遂行
します。
15
Winter 2014. Sabetta port construction, cargo vessel leaving port with
icebreaker assistance.
16
July 2014. Port Sabetta – constructing of berths.
17
Port of Sabetta and NSR cargo offloading ( 1000 tons).
01. 10. 2013
01. 10. 2014
Dry
309,2
721,8
Liquid
7,3
30,7
All for Sabetta
316,5
752,5 (+436)
All NSR region
2 252,6
2 758,8 (+506)
18
Aigust 2014, Sabetta port.
Bulk carrier broken stone offloading.
19
AARI prognosis for total ice area
тыс. кв. км
годы
20
Minimal ice – September 2012
Chukchi sea
Pevek
East-Siberian sea
Murmansk
Laptev sea
Kara sea
Хатанга
Sabetta
Tiksi
Dikson
21
Ice for 12 May 2014
Pevek
Murmansk
Хатанга
Sabetta
Tiksi
Dikson
22
July 2014. East Siberian Sea. Indiga M/V stuck in ice channel.
23
July 2014 Indiga voyage (Vaigach support).
29.06.2014
1300 NM - 6 days
05.07.2014
300 NM
9 days
14.07.2014
24
Polar Code northern area
Polar Code – some conclusions
Not contradicting any UNCLOS articles, including 234 ;
Based on SOLAS and MARPOL & includes AFS, BWM
and STCW rquerements;
Introduces “Polar Classes” system only dealing with ice
strengthening not referring to ME power and hull
shape;
For new and existing vessels survey is needed to issue
required certificate, manual and update ship
documents;
Multiply definitions (e.g. scope of application for ships
of certain types & tonnage, international voyage for
Antarctic region ) and statements need further
clarifications except for the geographical area.
26
ご清聴ありがとうご
ざいました
27