太陽光発電所建設現場の広域地図 A Wi de Vi ew of t he PV Si t e 沖縄県うるま市塩屋58-1
58-1 shi oya-Ur uma Ci t y Oki nawa-ken
北緯( Lat i t ude ) N26. 351782 東経( Longi t ude) 127. 860565
©スマートグリッドホーム㈱ 2005年~2013年
All rights reserved. Email address :
[email protected]
2
太陽光発電所建設現場の広域地図 A Wi de Vi ew of t he PV Si t e 沖縄県うるま市塩屋58-1
58-1 shi oya-Ur uma Ci t y Oki nawa-ken
北緯( Lat i t ude ) N26. 351782 東経( Longi t ude) 127. 860565
©スマートグリッドホーム㈱ 2005年~2013年
All rights reserved. Email address :
[email protected]
3
周辺位置図と航空写真 Vicinity map and Pr oj ect Si t e Bi r d` s Vi ew
現場は山林:The
The si t e i s a For est l and.
and
初期刈払費用は¥270,000程度:The expense for land weeding out is no more than \270,000
賃借可能な土地1, 983㎡
Rentable Land:1,983㎡
借地単価 年間打ち合わせ
買い取り単価は打ち合わせ
Year leasehold unit price will be meeting
Purchase price will be meeting
©スマートグリッドホーム㈱ 2005年~2013年
All rights reserved. Email address :
北緯( Lat i t ude ) N26. 351782 東経( Longi t ude) [email protected]
860565
4
太陽光発電所建設現場の状況
Pr oj ect Si t e Phot os
©スマートグリッドホーム㈱ 2005年~2013年
All rights reserved. Email address :
[email protected]
5
太陽光発電所建設現場の状況
Pr oj ect Si t e Phot os
©スマートグリッドホーム㈱ 2005年~2013年
All rights reserved. Email address :
[email protected]
6
現場における発電量算定根拠
Verification of the Power Output at the Project Site
©スマートグリッドホーム㈱ 2005年~2013年
All rights reserved. Email address :
[email protected]
7
沖縄県うるま市塩屋58-1の現場における年間の発電量算定根拠
沖縄県うるま市塩屋58-1の現場における年間の発電量算定根拠
http://app7.infoc.nedo.go.jp/cgi-bin/monsola.cgi?p=91166
1
(独)新エネルギー・産業技術総合開発機構(NEDO)の日射データベースによるとうるま市塩屋の現場から
北東10kmに隣接する宮城島20°と東京の真南、30°傾斜の場合の月平均日射量の年間平均値は下記の通
り。
①うるま市20°
②東京30°
①/②
(単位:kWh/㎡・day)
月平均日射量の年
間平均値
4.14
3.73
1.1260
2
よって現場は東京の日射量の112.60%の太陽エネルギー量を有していると言える。
3
例として:
保守的
一方で東京における1kW当たりの発電量はメーカーが自社製品のカタログに使用する保守的
なデータから1104.75kwh/kwと設定できる。(30°傾斜 真南の場合、パワコン、ケーブルロスも
なデータ
含む)
カナディアンソーラー 4.0kwの東京における年間発電量は4,419kwhと同社のHPに
表記されている。 1KWあたり、1104.75kwhとなる。
http://canadiansolar.co.jp/solar-panel/why-canadian-solar/
従って本候補地における発電量を次のように設定した。(小数点の切り捨て無しで計算)
・真南:20°傾斜の場合:1104.75x(112.60/100)=1243.95kwh/kWと設定した。
4
・真南:20° ・ソーラーの延長ケーブルによるロス=5%として年間の総発電量は下記の通り。
1104.75x(112.60/100)x(100-5)%(=1181.75kwh/kWp) x144kw=170,172kWh/年間
©スマートグリッドホーム㈱ 2005年~2013年
All rights reserved. Email address :
[email protected]
8
The Verification of the Power Output at the Project Site
1
According to the irradiation database of NEDO(The New Energy Development Organization ), the daily average
irradiation of shiono-Uruma, the nearest data point to the Project Site(Miyagi 10km North by East of the Project
Site ) and Tokyo ( 30 degree, true south ) is as follows:
① Uruma20°
2
(Unit:kWh/㎡・day)
②Tokyo30°
①/②
The Daily Average Irradiation
(30 Degree True South)
4.20
3.73
The project site is endowed with an irradiation of 112.60% that of Tokyo.
1.1260
3
We can safely say that the PV power output in Tokyo per kWp is kWh/kW. This number is derived
from the homepage data offered by Canadian Solar.( Canadian Solar Module produce
4419kwh/kW per 4.0kWp, including module loss, power conditioner loss or cable loss under the
condition of 30 degree true south. )
http://canadiansolar.co.jp/solar-panel/why-canadian-solar/
4
We have concluded that the PV power output at the project site can be derived as follows:
・True South:20°Degree Inclination: 1104.75x(112.60/100)=1243.95kwh/kW
・True South:20° the power output must be 2%less( See the diminishing rate table
in the next page: 98% of 30 degree true south.)
・We assume that the cable loss due to longer wiring of the PV plant is 5%
1104.75x(112.60/100)x(100-5)%(=1181.75kwh/kWp) x144kw=170,172kWh/year.
©スマートグリッドホーム㈱ 2005年~2013年
All rights reserved. Email address :
[email protected]
9
傾斜角度と方角による発電量の減衰度合い:真南、30°傾斜と比較して
傾斜角度と方角による発電量の減衰度合い:真南、30 傾斜と比較して
The Diminishing Rate of the PV Power Output by Inclination and Direction vs. True South and 30 degree.
Source: JPEA Japan Photovoltaic Power Association
True South
©スマートグリッドホーム㈱ 2005年~2013年
All rights reserved. Email address :
[email protected]
10
うるま市塩屋の現場に最も近い宮城島の日射量情報
うるま市塩屋の現場に最も近い宮城島の日射量情報 Irradiation Data of the Project
Site 北緯( Lat i t ude ) N26. 351782 東経( Longi t ude) 127. 860565
年間平均Annual Average:4.20kWh/㎡・day
方位Direction:真南 True South
架台傾斜角度: The Inclination Angle of the Mounting System 30°
沖縄は傾斜が20°の場合が
発電量が一番高くなる。
©スマートグリッドホーム㈱ 2005年~2013年
http://app7.infoc.nedo.go.jp/cgi-bin/monsola.cgi?p=91166
All rights reserved. Email address :
[email protected]
11
東京の日射量情報 Irradiation
Data in Tokyo (出所 Source:
出所 Source:NEDO
MonSolar )
東京の日射量情報 出所 Source:
年間平均 Annual Average:3.73kWh/㎡・day
N 35.6896, E139.7618
方位Direction:真南 True South,架台傾斜角度 The Inclination Angle of the Mounting System 30°
東京は傾斜が30°の場合が
発電量が一番高くなる。
©スマートグリッドホーム㈱ 2005年~2013年
Source: NEDO Monslolar Database http://app7.infoc.nedo.go.jp/cgi-bin/monsola.cgi?p=44132
All rights reserved. Email address :
12
[email protected]
沖縄県うるま市塩屋58-1
沖縄県うるま市塩屋58-1の地震・津波・気温の情報
塩屋58-1の地震・津波・気温の情報
Information of the earthquake and tsunami, temperature of Uruma Fukushima 北緯( Lat i t ude ) N26. 351782 東経( Longi t ude) 127. 860565
http://www.data.jma.go.jp/obd/stats/etrn/select/prefecture00.php?
prec_no=36&block_no=47598&year=&month=&day=&view=
©スマートグリッドホーム㈱ 2005年~2013年
All rights reserved. Email address :
[email protected]
13
現場におけるメンテナンス対応
Maintenance support at the Project Site
*自社のメンテナンス会社に依頼
年間メンテナンス詳細別途打合せ
*Depend on the Our company
*Meeting separately annual maintenance details
©スマートグリッドホーム㈱ 2005年~2013年
All rights reserved. Email address :
[email protected]
14
太陽光サポートセンターがメンテナンス
The solar support center of the center to the maintenance
©スマートグリッドホーム㈱ 2005年~2013年
All rights reserved. Email address :
[email protected]
15